Also today (it was quite a busy day), the tile guys came over to start the tile installation in the basement.
I have to say, this installer has impressed me on a number of occasions. By nature, I am skeptical. I always think people aren’t going to do a complete job or try to get around doing something. Everything I throw at this guy is answered very satisfactorily (in my opinion).
The job is bigger than I thought. They brought about half the tile because te other half was too heavy for his truck. When he pulled in the driveway, the bed was sagging quite a bit. When they started, everything was going very smoothly, but just slower than I expected. By the time 4PM rolled around, they were about 40% done laying the full pieces.
Tomorrow, they are coming back to lay the rest of the full pieces and some of the cut ones. He kept telling me there were a lot of cuts. I really don’t envy him, because this job is going to take a few days.
Here is what they have done so far…