The tile guy came over at 8AM this morning to finish up the tiling. All he had to do was the grout.
I must’ve gotten up about eight times last night for various reasons. I do this all the time when I am expecting someone to come over early in the morning. I heard a bump at about 6:30AM and I hopped out of bed. It wasn’t him, but I just stayed awake.
He did a really nice job. We both put the toilet back in (of which I bought the correct bolts). Then, after he left, I put the vanity back in and hooked up the plumbing.
All I have to do now is to hang the door moulding and installed the threshhold moulding on the floor in the doorway. It should look nice. After that, THE KITCHEN!!!
Leave a Reply