Saturday, June 28th, 2008
Today, the tile installers finished laying the full pieces of tile. Now, they have to come back on Monday to make all the cuts for all the edge pieces. I am going down tonight to count all the edge pieces we’ll need, just to make sure we have enough tile.
On Tuesday, they will come back again to do the grout. Well, that’s what I hope will happen anyway. I thought this job would be done in two days, but as time goes on, I am realizing that it is more work than I thought. 450 square feet is a lot of area to cover.
Here are some photos of today’s tile installation.



Related posts
Posted in Home Improvement | No Comments »
Friday, June 27th, 2008
Also today (it was quite a busy day), the tile guys came over to start the tile installation in the basement.
I have to say, this installer has impressed me on a number of occasions. By nature, I am skeptical. I always think people aren’t going to do a complete job or try to get around doing something. Everything I throw at this guy is answered very satisfactorily (in my opinion).
The job is bigger than I thought. They brought about half the tile because te other half was too heavy for his truck. When he pulled in the driveway, the bed was sagging quite a bit. When they started, everything was going very smoothly, but just slower than I expected. By the time 4PM rolled around, they were about 40% done laying the full pieces.
Tomorrow, they are coming back to lay the rest of the full pieces and some of the cut ones. He kept telling me there were a lot of cuts. I really don’t envy him, because this job is going to take a few days.
Here is what they have done so far…




Related posts
Posted in Home Improvement | No Comments »