Justa Rollin’ Right Along


The Basement Tile is Finished

Wednesday, July 2nd, 2008



I am rather impressed with myself. A few weeks ago, I was scratching my chin, wondering what to do with this . Now, I am standing on brand new throughout the entire thing. I think I might be amazing.

So, after five short days, the guys completed the job and left. I thought it would take two…and it may have if I was doing it. I tend to work long hours. These guys liked to work for a few hours a day. I will give them credit for doing a really good though. Installing is a little weird. The installer is kind of bound by drying time, so they can only do so much.

Here are some photos of the finished job…

The reason I say they did a good installation is because I watched him place each very carefully. He didn’t just slap them down. He put a little extra thin-set on the corners and after the was down, he made sure it was solid. I am assuming some installers might not do that.

So now, all I need to do is seal the , paint the and put it back on the walls. Then, we are going to bring one couch down there and set up the TV and all the electronics.

Related posts