Wednesday, July 2nd, 2008
I am rather impressed with myself. A few weeks ago, I was scratching my chin, wondering what to do with this basement. Now, I am standing on brand new tile throughout the entire thing. I think I might be amazing.
So, after five short days, the tile guys completed the job and left. I thought it would take two…and it may have if I was doing it. I tend to work long hours. These guys liked to work for a few hours a day. I will give them credit for doing a really good installation job though. Installing tile is a little weird. The installer is kind of bound by drying time, so they can only do so much.
Here are some photos of the finished job…



The reason I say they did a good installation is because I watched him place each tile very carefully. He didn’t just slap them down. He put a little extra thin-set on the corners and after the tile was down, he made sure it was solid. I am assuming some tile installers might not do that.
So now, all I need to do is seal the grout, paint the base moulding and put it back on the walls. Then, we are going to bring one couch down there and set up the TV and all the electronics.
Related posts
Posted in Home Improvement | 3 Comments »
Thursday, June 5th, 2008
I have been pretty busy lately, between working, planting plants, getting the cars registered and, oh yeah, re-doing the basement.
I believe I told you about it in an earlier post. Then, I had the floor torn up and was considering what to put on it. Now, I am paiting the whole thing up.
I realized something along this short journey. That is, I hate painting. I mean, I can do it in short bursts, but I lose interest fast. One room is fine, two maybe, three weird sections and I’m lost. I have to say it’s getting there though.


We picked out a color that looks very nice when dried. We got a little nervous when I started putting it on the walls, but got over it. I am also painting all the trim and doors white.
You may be asking yourselves, “Why, Jay, are you doing this now? Why so fast…what’s the rush?” Well, I’ll tell you. The whole reason is that we are going to put a pellet stove in the basement. In order to put a pellet stove down there, we need a new floor. In order to put in a new floor, we need to remove all the base moulding. If the base moulding is off, we may as well paint the place. Also, since the moulding is off, we might as well take this time to replace the French doors leading to outside. They need to be replaced and it needs to be done before the floor goes in.
But “why now” you ask? The reason is that you need to get a pellet stove in the summer. Things are slower and more available. Also, pellets are cheaper. We will need at least three tons.
Yeah, all this just to put a pellet stove in the basement and get rid of the carpet. I told you how I feel about carpets. I also removed the carpet from the basement stairs last night. That was fun. I really like pulling up tack strips and pulling out staples. Good thing I am proficient at this type of thing.
I am setting up the date to have the door installed tomorrow. When the install happens, you’ll know about it. I am also having the tile guy come over tomorrow to give me a price on the installation. I was going to do it myself, but I quickly lost interest in that once I started painting.
Related posts
Posted in Home Improvement | 1 Comment »