Justa Rollin’ Right Along

I Finished Sealing The Driveway



August 19, 2008 – 10:24 am | by jaygaulardcom



Yesterday, I drove over to to get two more 5-gallon buckets of sealer and one more bucket of filler. After I got sidetracked at the (which I wrote about in the previous post), I came back to finish up the .

The only thing I did differently this time was to clean the , fix all the and then seal the immediately afterward. The filler instructions say that it should dry for 24 hours, but I have a feeling it will dry just fine.

Sealed driveway from road

Sealed from road

Looking up driveway

Looking up

Bottom part of driveway

Bottom part of

I will tell you that there is some serious grip with the sealer. I just walked up the the road to the the garbage can and I almost stubbed my toe a bunch of times.

I have to go back to this afternoon to return a 5- of sealer and one bucket of filler. Overall, I used 30 gallons of sealer and two gallons of filler. That should be good for a few years and now it looks like we are on a brand new .

Related posts

Tags: , , , , , , , , ,


Post a Comment