The Tile Installation Begins



Written on June 27, 2008 – 6:19 pm | by jaygaulardcom |


Also today (it was quite a busy day), the guys came over to start the installation in the .

I have to say, this installer has impressed me on a number of occasions. By nature, I am skeptical. I always think people aren’t going to do a complete job or try to get around doing something. Everything I throw at this guy is answered very satisfactorily (in my opinion).

The job is bigger than I thought. They brought about half the because te other half was too heavy for his truck. When he pulled in the driveway, the bed was sagging quite a bit. When they started, everything was going very smoothly, but just slower than I expected. By the time 4PM rolled around, they were about 40% done laying the full pieces.

Tomorrow, they are coming back to lay the rest of the full pieces and some of the cut ones. He kept telling me there were a lot of cuts. I really don’t envy him, because this job is going to take a few days.

Here is what they have done so far…

Related posts


AddThis Social Bookmark Button

Tags: , ,


Post a Comment

About Me

This is my blog. Welcome to it. I write a lot of stuff that doesn't pertain to anything in particular, but you may find a common theme in here somewhere. Enjoy. More

Want to subscribe?

 Subscribe in a reader Or, subscribe via email:
Enter your email address:  
Find entries :