Justa Rollin’ Right Along

The Kitchen Installer is Gone



January 24, 2008 – 9:57 pm | by jaygaulardcom



The installer finished up here at about 7PM. He worked his butt off today. I was second guessing that it would take two days to install a , but I was wrong. All the trim work took a long time. The majority of the time was taken up hanging the , installing the knobs and handles and the cutting and nailing on the kick plates. I hate that kind of work and he was very good at it. He made all my improvements look kind of amateur…wait, I am an amateur. That makes me feel better.

There is still some work that I need to do myself, like hang a piece of wood right above the , hang the around the ceiling, hook up the plumbing for the sink and a bunch of other little things.

I am going to show you three photos of half of the . I moved all the junk to the other side, so when that’s all cleaned up, I will take some more pictures of the rest of the . We feel so much better actually having counter space and (almost) a sink back. When the dishwasher gets here, I am going to feel like I live in a palace.

dsc03557.JPG

I moved the back into its spot. I found some stainless steel cleaner and it worked wonders on both the and the . The space right above the is where I need to put the piece of board. I want it to be snug.

dsc03559.JPG

I really like the way the corner cabinet goes to the ceiling and the way the moulding hugs all the . It makes that corner a focal point.

dsc03558.JPG

Me (again) amazed that someone can cut moulding so nicely.

Related posts

Tags: , , , , , ,


  1. 2 Responses to “The Kitchen Installer is Gone”

  2. By Angie on Jan 24, 2008 | Reply

    Nice kitchen, I like :)

  3. By Paul on Jan 25, 2008 | Reply

    Jay, That looks fantastic. It really should go a long long way toward sprucing up the interior of your house.

Post a Comment